Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | basingstoke, ncn23 |
Date time: | 3.48pm, Wednesday 11th November, 2020 |
Time line: | Earlier | Later |
Facing: | Bearing of 89° |
Added by: | jpennycook |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Jon Pennycook |
Area: | Basingstoke |
The shared use path to War Memorial Park has finally reopened
Comments reflect the views of the original submitter only.